Before the drywall goes up, the duct system goes in. Framing, ceiling boots set in the trusses, and flex duct staged room by room — a rough-in from the Fast AC crew.

On a new build, the ductwork goes in while the house is still framing and trusses — long before there's a ceiling to hide it. Get the rough-in right and every room cools evenly for decades; get it wrong and no air conditioner can save it.
On this rough-in, insulated flex duct runs were routed through the ceiling trusses and metal duct boots set where each ceiling register will land, with the framing open and ladders up throughout the house. Bags of R6 flex duct were staged inside the framed rooms, ready to be run as the crew worked through the layout.
This is the stage of the job our in-house fabrication shop exists for: duct systems designed for the actual house, built to fit, and installed by the same crew that will set the equipment later.
- Insulated flex duct runs routed through the ceiling trusses
- Metal ceiling duct boots set in the trusses
- Bags of R6 flex duct staged for the rough-in
- Duct design and installation by our own crew